5
votes
2answers
62 views

swapping lead when climbing in a group of three using a pair of half ropes

On a multi-pitch route when all climbers have reached the belay point, what is the best way/ what considerations need to be made, in order to swap lead. obviously the leader will need to be tied into ...
3
votes
1answer
39 views

what to do with the lap coiled rope if the belayer wishes to lead consecutive pitches

Imagine a multi-pitch climbing situation where a lead climber has just finished belaying the second from a hanging belay position. The rope is coiled over the anchor cord (or clove hitched sharp end). ...
7
votes
2answers
282 views

Using a Girth Hitch in Alpine Draws

I've recently started making my alpine (or "trad") draws by girth hitching one end of a sling to the gear side carabiner and then clipping and passing the rope side through as usual. The girth hitch ...